
Potential Bad News
Moderators: Brian, Metalfreak, MS_39455, WREKage Staff
Last night I was helping out at the old studio, and Thomas (the chief engineer) came in the studio. He was not happy, not at all. Apparently, Harris has told him that they will not be able to deliver on time as scheduled. I didn't talk to Thomas directly, but from what I was hearing, it did not sound good. I heard things like "automation" and "no dj's in the studio". You guys might want to cross your fingers...

Well no, this is a problem with Harris, not us. Apparently Harris has told Thomas that they won't be delivering on time, so they're the ones that are procrastinating. Still, I don't know entirely what it's about. For those of you who might be wondering, Harris is a telecom company this is providing some of the engineering hardware necessary for the new studio, per my understanding.
-
- Member
- Posts: 325
- Joined: Thu July 1st, 2004, 4:36 am
-
- WREKage Staff
- Posts: 1757
- Joined: Fri June 25th, 2004, 2:28 am
- Location: Immanion, Almagabra
- Contact:
I wasn't thinking we'd have a show on the 30th anyway. If they can move the station and get it back up and running within a few days, I'll be extremely impressed.
As it is, we need to move soon. The old building is starting to look like downtown Beirut inside, and the bathrooms........well........ :t01l3t:
As it is, we need to move soon. The old building is starting to look like downtown Beirut inside, and the bathrooms........well........ :t01l3t:
Who is online
Users browsing this forum: No registered users and 2 guests